Saturday, May 23, 2009

The Fire Bunker


May 2009: laying the concrete pipes for our fire bunker at Jarrahdale. Pipes supplied by Humes. Gary, the driver and delivery man was very helpful and spent a lot of time getting everything in the correct position. I don't know what I'd have done without him. Thanks Gary. Each pipe weighs nearly two tonnes. The total length of the two pipes was approximately 5 metres.
Posted by Picasa

0 Comments:

Post a Comment

<< Home